Supply of a complete stormwater treatment plant at the construction site in Leporano (TA), for a total of 2500 square meters of surface to be treated.
The plant supplied consists of two polyethylene tanks, one for desanding and one for de-oiling, a sorting tank and an inspection well.
Being installed in a non carriageable area, the polyethylene solution proved to be the most advantageous both in terms of cost and speed of installation.
The staff of Idromet Sider is able to size these types of plants from scratch and to offer the client the most suitable and economically advantageous solution.
Gallery